Accessibility:
Text size
Tue. Nov 24th, 2026
KeyBank Tower at Second and Main streets in Dayton, OhioThe KeyBank Tower, also known as the Mead Tower, at 10 West Second Street in Dayton, Ohio. Commissioners approved $83,122 to winterize the vacant tower. Photo: Warren LeMay, CC BY-SA

DAYTON, Ohio — Dayton city commissioners have approved an $83,122 service agreement to winterize the vacant KeyBank Tower downtown, the latest holding cost for the 27-story building the city took back in April after a planned buyer walked away.

The agreement with Hobbs Industrial Piping Inc. covers winterization of the tower — also known as the Mead Tower — at 10 West Second Street through June 30, 2027, according to the record of the City Commission’s November 18, 2026, meeting.

City Manager Shelley Dickstein declared an emergency in mid-September to speed up hiring a contractor for stabilization, management and preservation of the tower after a potential buyer withdrew from a purchase deal, the Dayton Daily News reported. The commission approved about $83,000 to drain the building’s systems, and the city projects about $400,000 in utility and stabilization costs through the end of the year, according to the Dayton Daily News.

The city regained control of the building — Dayton’s second-tallest — on April 1, 2026, after Stratacache owner Chris Riegel withdrew from a 2023 agreement to take over the property to focus on his core business, K99.1FM reported. The tower was completed in 1975 as the headquarters of the Mead Corporation; KeyBank later occupied it before also vacating, K99.1FM reported.

“Currently in the due process of understanding the building’s conditions,” Dayton Development Coordinator Cole Hetman told K99.1FM as the city resumed control. “We were looking at the mechanical operating systems, and we also need to evaluate what our holding costs are going to be.” The winterization contract is one of those holding costs made concrete: an empty tower still needs its pipes protected, its utilities maintained and some elevators running through an Ohio winter.

City staff are evaluating the building’s future, with scenarios including a possible conversion to apartments, K99.1FM reported, drawing on the city’s experience redeveloping the Dayton Arcade with private partners. A downtown property owner had held a purchase option on the tower and did not follow through, and the city agreed not to pursue more than $600,000 in unpaid rent and tax obligations tied to the property, according to the Dayton Daily News.

What happens next runs on two tracks: the winterization work protects the building through June 30, 2027, under the Hobbs agreement, while the city’s studies of the tower’s condition and reuse options are expected to give commissioners a path forward — redevelopment, sale, or a harder decision about the building’s future.

Photo: Warren LeMay, CC BY-SA

By Julie Berger

Julie Berger is NewsForce247's general assignment reporter for Southwest Ohio, covering Cincinnati, Dayton, and the counties along the river and the interstate.

Leave a Reply

Your email address will not be published. Required fields are marked *